| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
One CYL |
Right Bank | 9.6 | 6.9 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
Left Bank | 6.7 | 0.0 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
Both Banks | 13.7 | 9.5 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
All Cyls |
Both Banks | 18.8 | 13.4 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
Right Bank | 12.7 | 9.0 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
Left Bank | 12.7 | 8.9 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
Add Following Operations If Performed With Piston & Ring Jobs |
Crankshaft, Renew | 4.8 | 0.0 | A | |
Main Bearings, Renew | 1.6 | 0.0 | A | |
Oil Pump, Renew | 1.0 | 0.0 | A | |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
Rear Main Oil Seal, Renew | 1.1 | 0.0 | A | |
Timing Chain, Renew | 1.4 | 0.0 | A | |
Tune-Up | 0.8 | 0.0 | A | |
Note |
To Grind Valves, Add | 3.8 | 2.7 | A | |