Window Channel Replacement - Door
REMOVAL PROCEDURE1. Remove the trim panel.
2. Remove the water deflector.
3. Remove the sealing strip.
4. Remove the window.
5. Remove the front upstop adjuster nut.
6. Remove the front upstop adjuster.
7. Remove the bolt.
IMPORTANT: Do not damage the seal.
8. Move the top of the front run channel (2) away from the mirror.
9. Rotate the channel toward the bottom of the door.
10. Pull up on the bottom of the channel in order to release the channel from the retainer.
11. Remove the front run channel (2).
INSTALLATION PROCEDURE
1. Install the front run channel (2) into the door, parallel to the bottom of the door.
2. Align the lower adjuster into the retainer.
3. Swing up the top of the front run channel (2).
4. Align the retainer to the bolt hole.
NOTE: Refer to Fastener Notice in Service Precautions.
5. Install the bolt.
Tighten
Tighten the bolt to 11 N.m (97 lb in).
6. Install the upstop adjuster.
7. Install the nut.
Tighten
Tighten the nut to 9 N.m (80 lb in).
8. Apply a thin coat of lubricant GM P/N 99882386 or the equivalent onto the run channels.
IMPORTANT: Avoid lubrication build-up on the window run channels. Ensure that the lubricant does not contact the door window or belt line sealing strips.
9. Install the window.
10. Perform the window adjustments as needed. Refer to Window Adjustment - Door.
11. Install the sealing strip.
12. Install the water deflector.
13. Install the trim panel.