Ignition Coil(S) Replacement - Bank 1
REMOVAL PROCEDURELocations View:
1. Remove the fuel injector sight shield.
2. Disconnect the ignition control module (ICM) electrical connector.
3. Disconnect the secondary air injection (AIR) vent solenoid electrical connector.
4. Remove the AIR shut-off valve.
5. Using the removal sequence, remove the ignition cassette retaining bolts.
6. Carefully, remove the ignition cassette.
INSTALLATION PROCEDURE
IMPORTANT: Be sure the ignition cassette grounding spring and insulator are in place when installing the ignition cassette.
Locations View:
1. Connect the spark plug boots to the spark plugs. Carefully, install the ignition cassette.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the ignition cassette retaining bolts.
Tighten
Using the installation torque sequence, tighten the ignition cassette retaining bolts to 9 N.m (80 lb in).
3. Install the AIR shut-off valve.
4. Reconnect the AIR vent solenoid electrical connector
5. Reconnect the ignition cassette electrical connector.
6. Install the fuel injector sight shield.