Data Link Connector: Service and Repair
DATA LINK CONNECTOR REPLACEMENTREMOVAL PROCEDURE
1. Lower the I/P closeout panel. Refer to Closeout/Insulator Panel Replacement - Left.
2. Remove the screws securing the data link connector to the I/P carrier.
INSTALLATION PROCEDURE
NOTE: Refer to Fastener Notice in Service Precautions.
1. Install the screws securing the data link connector to the I/P carrier.
Tighten
Tighten the screws to 2 N.m (18 lb in).
2. Install the I/P closeout panel.