Operation CHARM: Car repair manuals for everyone.

Blower Motor (RHD)



BLOWER MOTOR REPLACEMENT (RHD)

REMOVAL PROCEDURE
1. Remove the left closeout insulator panel.
2. Remove the IP compartment.




3. Disconnect the electrical connector (1).




4. Remove the blower motor screws (1).




5. Remove the blower motor.

INSTALLATION PROCEDURE




1. Install the blower motor.




2. Install the blower motor screws (1).

NOTE: Refer to Fastener Notice in Service Precautions.

Tighten the screws to 1.5 N.m (13 lb in).

3. Connect the blower motor electrical connector (1).




4. Install the IP compartment.
5. Install the left closeout insulator panel.