Data Link Connector: Service and Repair
DATA LINK CONNECTOR REPLACEMENT
REMOVAL PROCEDURE
1. Lower the instrument panel (I/P) closeout panel. Refer to Instrument Panel Insulator Panel Replacement - Left Side in Instrument Panel, Gages, and Console.
2. Remove the screws securing the data link connector to the I/P carrier.
INSTALLATION PROCEDURE
1. Install the screws securing the data link connector to the I/P carrier.
NOTE: Refer to Fastener Notice in Service Precautions.
Tighten the screws to 2 N.m (18 lb in).
2. Install the I/P closeout panel.