Alternator: Service and Repair
Generator Replacement (LH2 - 8 CYL, 4.6L, DOHC, HO)
Removal Procedure
Caution: Refer to Battery Disconnect Caution (Battery Disconnect Caution) .
1. Remove the drive belt. Refer to Drive Belt Replacement (Drive Belt Replacement) .
2. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Service and Repair) .
3. Drain the cooling system. Refer to Cooling System Draining and Filling (Static Fill) (Service and Repair)Cooling System Draining and Filling (GE 47716) (Service and Repair) .
4. Remove the front suspension crossmember. Refer to Front Suspension Crossmember Replacement () .
5. Remove the bolt from the generator coolant hose assembly on the generator.
6. Disconnect the generator coolant hose assembly from the generator port.
7. Disconnect the generator electrical connector (1).
8. Remove the starter cable terminal from the generator:
1. Slide the boot (1) back along the cable.
2. Remove the starter cable nut (2).
3. Remove the starter cable terminal (3) from the stud (4).
9. Remove the upper generator bolt from the generator.
10. Remove the idler pulley thru-bolt (1).
11. Remove the idler pulley nut (2).
12. Remove the idler pulley assembly (3).
13. Remove the generator (4).
Installation Procedure
1. Install the generator.
Notice: Refer to Fastener Notice (Fastener Notice) .
2. Install the upper generator bolt.
Tighten the generator bolts to 50 N.m (37 lb ft).
3. Install the idler pulley assembly (3) and bolt (1).
4. Install the nut (2).
Tighten the generator fasteners to the following torque values:
1. Tighten the idler pulley bolt (1) to 50 N.m (37 lb ft).
2. Tighten the idler pulley nut (2) to 50 N.m (37 lb ft).
5. Install the starter cable terminal to the generator:
1. Install the starter cable terminal to the stud.
2. Install the starter cable nut (2).
Tighten the starter cable nut to 20 N.m (15 lb ft).
3. Slide the boot (1) over the generator stud (4).
6. Position the generator coolant hose assembly to the generator and secure with the bolt.
Tighten the bolt to 27 N.m (20 lb ft).
7. Connect the generator electrical connector (1).
8. Install the front suspension crossmember. Refer to Front Suspension Crossmember Replacement () .
9. Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) (Service and Repair)Cooling System Draining and Filling (GE 47716) (Service and Repair) .
10. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Service and Repair) .
11. Install the drive belt. Refer to Drive Belt Replacement (Drive Belt Replacement) .