Part 2
Supercharger Cleaning and Inspection
Special Tools
* EN-47814 Supercharger Bypass Valve Actuator Setting Tool
* EN-47833 Supercharger Service Holding Fixture
Assemble Procedure
Note: In order to protect and service components, on the supercharger, ensure the EN-47833 is on the supercharger during the disassembly and assembly.
1. Install the NEW charge air cooler housing expansion plug.
2. Install the NEW charge air cooler housing interior O-ring gaskets.
3. Install the NEW charge air cooler housing perimeter gasket.
4. Install the charge air cooler housing.
Caution: Refer to Fastener Caution (Fastener Caution)
5. Install the long charge air cooler bolts and tighten to 10 Nm (89 lb in).
6. Install the short charge air cooler perimeter bolts and tighten to 10 Nm (89 lb in).
Note: The charge air cooler cooling tubes are replaced as a set. If any one of the charge air cooler cooling tubes needs to be replaced, all the charge air cooler cooling tubes must be replaced in order to maintain consistent cooling of the charge air.
7. Carefully install the outboard charge air cooler cooling tubes.
8. The charge air cooler cooling outboard tubes are installed with the restrictor plates (1) to the back of the manifold, away from the drive belt pulley.
9. Align the wide notch at a 45 degree angle up from horizontal and outboard as shown.
Note: The charge air cooler cooling tubes are replaced as a set. If any one of the charge air cooler cooling tubes needs to be replaced, all the charge air cooler cooling tubes must be replaced in order to maintain consistent cooling of the charge air.
10. Carefully install the inboard charge air cooler cooling tubes.
11. The charge air cooler cooling inboard tubes are installed with the opening (1) to the back of the manifold. The restrictor plates will be to the front of the manifold, towards the drive belt pulley.
12. Align the wide notch at a 45 degree angle up from horizontal and outboard as shown.
13. Install the NEW charge air cooler cooling fill cap O-ring.
14. Install the charge air cooler cooling fill cap.
15. Ensure the charge air cooler cooling fill cap is installed in the proper orientation.
* The alignment boss (1) is at the rear of the charge air cooler manifold
* The alignment boss (2) is at the front of the charge air cooler cooling fill cap
16. Install the charge air cooler cooling fill cap bolts and tighten to 10 Nm (89 lb in).
17. Install the charge air cooler cooling tube rear spacers.
18. Install the NEW charge air cooler cooling tube rear O-rings.
19. Install the NEW charge air cooler rear manifold gaskets.
20. Install the charge air cooler rear manifold.
21. Install the charge air cooler rear manifold bolts and tighten to 10 Nm (89 lb in).
22. Install the charge air cooler cooling tube front spacers.
23. Install the NEW charge air cooler cooling tube front O-rings.
24. Install the NEW charge air cooler front manifold gasket.
25. Install the charge air cooler front manifold.
26. Install the charge air cooler front manifold bolts and tighten to 10 Nm (89 lb in).
27. Coat the IAT sensor 2 threads with sealant GM P/N 12346004 (Canadian P/N 10953480), or equivalent.
28. Install the IAT sensor 2 into the supercharger and tighten to 20 Nm (15 lb ft).
29. Install the fuel injection fuel rail crossover tube clip.
30. Install the bypass valve actuator cable.
31. Install the bypass valve actuator cable bracket bolts to the supercharger and tighten to 10 Nm (89 lb in).
32. Slide the bypass valve actuator cable clip onto the pin on the supercharger bypass valve.
Note: Tool shown is the clip shipped with a new bypass valve actuator cable. The flat end of the EN-47814 can be used for the same purpose.
33. Pull the retainer up on the wire above the bypass valve actuator cable clip in order to install the EN-47814 The EN-47814 must be used to set the necessary slack in the bypass valve actuator cable.
34. Place the EN-47814 on the cable.
35. Ensure to eliminate the slack in the bypass valve actuator cable by pressing down on the wire retainer.
36. Install the bypass valve actuator.
37. Align the bypass valve actuator rod to the bypass valve actuator cable.
38. Align the tab on the bypass valve actuator rod with the slot in the bypass valve actuator cable end.
39. Slide the bypass valve actuator rod into the bypass valve actuator cable.
40. Pivot the bypass valve actuator counterclockwise in order to install bypass valve actuator.
41. Loosely install the bypass valve actuator bolts.
42. Pull up on the bypass valve actuator in order to eliminate any slack in the bypass valve actuator cable.
43. Tighten the bypass valve actuator bolts to 10 Nm (89 lb in) while maintaining proper alignment between the bypass valve actuator and the bypass valve actuator cable.
Note: Tool shown is the clip shipped with a new bypass valve actuator cable. The flat end of the EN-47814 an be used for the same purpose.
44. Remove the EN-47814 on the bypass valve actuator cable at the bypass valve.
45. Install the charge air bypass regulator solenoid valve.
46. Install the charge air bypass regulator solenoid valve bolt and tighten to 10 Nm (89 lb in).
47. Install the charge air bypass regulator solenoid valve pressure hose.
48. Connect the charge air bypass regulator solenoid valve pressure hose at the supercharger pressure port (1).
49. Connect the charge air bypass regulator solenoid valve pressure hose at the upper port of the charge air bypass regulator solenoid valve (2).
50. Install the bypass valve actuator pressure hose.
51. Connect the bypass valve actuator pressure hose at the lower port of the supercharger bypass valve actuator (1).
52. Connect the bypass valve actuator pressure hose at the lower port of the charge air bypass regulator solenoid valve (2).
53. Install the bypass valve actuator vacuum hose to the supercharger.
54. Connect the bypass valve actuator vacuum hose at the upper port of the supercharger bypass valve actuator (1).
55. Connect the bypass valve actuator vacuum hose at the center small vacuum port of the supercharger (1).
56. Install the NEW throttle body O-ring.
57. Install the throttle body.
58. Install the throttle body bolts and tighten to 10 Nm (89 lb in).
59. Install the NEW O-ring onto the EVAP canister purge solenoid valve.
60. Install the EVAP canister purge solenoid valve.
61. Install the EVAP canister purge solenoid valve bolt and tighten to 10 Nm (89 lb in).
62. Install and connect the dirty air PCV tube onto the supercharger.