Overhaul Procedure Steps
ENGINE OVERHAUL
In order to overhaul, follow the sequence below.
1. Timing Belt Inspection
2. Timing Belt Adjustment
3. Oil Pump Cleaning and Inspection
4. Exhaust Manifold Removal
5. Crankshaft and Bearing Cleaning and Inspection
6. Piston, Connecting Rod, and Bearing Cleaning and Inspection
7. Valve Rocker Arm Cleaning and Inspection
8. Cylinder Head Disassemble
9. Cylinder Head Cleaning and Inspection
10. Valve Guide Reaming/Valve and Seat Grinding
11. Cylinder Head Assemble
12. Exhaust Manifold Installation