Operation CHARM: Car repair manuals for everyone.

Alternator: Service and Repair



Generator Replacement (RPOs LZE/LZ4/LZ9)

Removal Procedure




1. Disconnect the negative battery cable.
2. Remove the drive belt.
3. Reposition the protective boot (2) from the generator output BAT terminal.
4. Remove the generator output BAT terminal nut (5).
5. Remove the engine harness terminal (4) from the generator.
6. Disconnect the generator electrical connector (3).




7. Remove the generator bolt and stud.




8. Remove the generator bolt.
9. Remove the generator.

Installation Procedure




1. Install the generator.
2. Install the generator bolt until snug.






Notice: Refer to Fastener Notice.

3. Install the generator bolt and stud.

Tighten the bolts/stud to 50 N.m (37 lb ft).




4. Connect the generator electrical connector (3).
5. Install the engine harness terminal (4) to the generator.
6. Install the generator output BAT terminal nut (5).

Tighten the nut to 30 N.m (22 lb ft).

7. Position the protective boot (2) to the generator output BAT terminal.
8. Install the drive belt.
9. Connect the negative battery negative cable.