5. Park/Neutral Position Switch Inspection
Park/Neutral Position Switch Inspection
1. Disconnect the park/neutral position (PNP) switch.
2. Test the continuity of each range according to the polarity and indicator circuit table.
3. If an incorrect range is displayed during testing, replace the PNP switch.