Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0AAdd The Following Operations If Performed Along With "Piston & Ring" Jobs.
Crankshaft, Renew4.60.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.50.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Timing Chain, Renew1.20.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0ASee Valves Grind Head Removed & Combinations
Valve Grind
    See Valves Grind Head Removed & Combinations
One CYL
Right Bank8.36.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.26.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.19.1AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.50.3
With A.I.R., Add0.50.3
With Cruise Control, Add0.40.2
With PS, Add0.20.1
All Cyls
Right Bank10.37.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.27.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.011.0AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.50.3A
With A.I.R., Add0.50.3A
With Cruise Control, Add0.40.2A
With PS, Add0.20.1A