Catalytic Converter Replacement (Gas, Export)
REMOVAL PROCEDURE1. Raise and suitably support the vehicle. Refer to Vehicle Lifting.
2. Remove the nuts from the Y-pipe flat flange.
3. Remove the muffler and the catalytic converter assembly.
4. Remove the nuts, studs, and flange seals from the Y-pipe and the exhaust manifold.
INSTALLATION PROCEDURE
1. Install the new flange seals.
NOTICE: Refer to Fastener Notice in Service Precautions.
2. Install the new studs.
^ Tighten the studs to 22 Nm (16 ft. lbs.).
3. Install the new nuts connecting the Y-pipe, catalytic converter assembly to the exhaust manifold.
^ Tighten the nuts to 64 Nm (47 ft. lbs.).
4. Position the Y-pipe and the catalytic converter assembly to the flat flange.
5. Install the nuts to the flat flange studs.
^ Tighten the nuts to 64 Nm (47 ft. lbs.).
6. Check for clearance and alignment.
7. Lower the vehicle.