Data Link Connector: Service and Repair
DATA LINK CONNECTOR REPLACEMENT
REMOVAL PROCEDURE
1. Lower the instrument panel (I/P) closeout panel. Refer to Instrument Panel Insulator Replacement.
2. Remove the screws securing the data link connector (DLC) to the I/P carrier.
INSTALLATION PROCEDURE
1. NOTE: Refer to Fastener Notice.
Install the screws securing the DLC to the I/P carrier.
Tighten the screws to 2 N.m (18 lb in).
2. Install the I/P closeout panel.