Data Link Connector: Service and Repair
Data Link Connector Replacement
Removal Procedure
1. Lower the instrument panel (I/P) closeout panel. Refer to Instrument Panel Insulator Replacement (Instrument Panel Insulator Replacement).
2. Remove the screws securing the data link connector (DLC) to the I/P carrier.
Installation Procedure
Caution: Refer to Fastener Caution (Fastener Caution).
1. Install the screws securing the DLC to the I/P carrier.
Tighten the screws to 2 Nm (18 lb in).
2. Install the I/P closeout panel. Refer to Instrument Panel Insulator Replacement (Instrument Panel Insulator Replacement).