Glove Compartment
Tighten the two screws that secure the latch striker to the instrument panel glove box opening upper reinforcement to 2.2 N.m (20 in. lbs.) torque.Tighten the center screw in the bottom of the glove box bin 2.2 N.m (20 in. lbs.) torque.
Tighten the four screws that secure the top of the glove box bin and the glove box latch to the glove box door to 2.2 N.m (20 in. lbs.).
Tighten the two screws that secure each outboard flange of the glove box bin to the glove box door to 2.2 N.m (20 in. lbs.).