Geartrain
Fig. 43:
1. Remove the bolts holding the 5-6 crossover bracket to the clutch housing.
Fig. 42:
2. Attach Fixture 8232 to the output shaft and countershaft.
3. Attach an engine crane, or equivalent, to Fixture 8232 and raise the geartrain approximately 1/4 inch from the clutch housing.
4. Remove the 5-6 crossover bracket from the clutch housing.
5. Lower the geartrain back into the clutch housing.
Fig. 44:
6. Install Holding Tool 8242 onto the 5-6 synchro and tighten the screw to hold the 5-6 synchro together during the removal operation.
NOTE: Pay close attention to the order of the shift fork arms at the primary shift rail when they are in the Neutral position.
7. Raise the geartrain and shift rails until all the shift rails clear the clutch housing.
Fig. 45:
8. Remove the shift rails from the rest of the geartrain.
9. Raise the geartrain until the input shaft is clear of the clutch housing.
Fig. 46:
10. Remove the geartrain from the clutch housing and install the geartrain into Support Stand 8246.
11. Remove Fixture 8232 from the output shaft and the countershaft.
12. Separate the countershaft from the output shaft.
13. Separate the output shaft from the input shaft. Be sure to hold the 5-6 synchro together while removing the output shaft to prevent the synchro sleeve from being dislodged from the synchro hub.