Operation CHARM: Car repair manuals for everyone.

Camshaft, Engine

Bearing Diameter (Inside) No. 1 2.000 - 2.001 Inch (in)
No. 2 1.984 - 1.985 Inch (in)
No. 3 1.953 - 1.954 Inch (in)
No. 4 1.5265 - 1.5653 Inch (in)
Journal Diameter No. 1 1.998 - 1.999 Inch (in)
No. 2 1.982 - 1.983 Inch (in)
No. 3 1.951 - 1.952 Inch (in)
No. 4 1.5605 - 1.5615 Inch (in)
Bearing to Journal Clearance Standard 0.001 - 0.003 Inch (in)
Max Allowable 0.005 Inch (in)
End Play 0.002 - 0.010 Inch (in)
Valve Lift @ Zero Lash Intake 0.410 Inch (in)
Exhaust 0.417 Inch (in)
Valve Timing Exhaust Valve Closes 33 Degrees After Top Dead Center (deg ATDC)
Exhaust Valve Opens 56 Degrees Before Bottom Dead Center (deg BBDC)
Exhaust Valve Duration 269 Degrees (deg)
Intake Valve Closes 62 Degrees After Bottom Dead Center (deg ABDC)
Intake Valve Opens 7 Degrees Before Top Dead Center (deg BTDC)
Intake Valve Duration 249 Degrees (deg)
Valve Overlap 41 Degrees (deg)