Installation
INSTALLATION1. Clean all surfaces of cylinder block and cylinder heads.
2. Clean cylinder block front and rear gasket surfaces using a suitable solvent.
3. Position new cylinder head gaskets onto the cylinder block.
4. Position cylinder heads onto head gaskets and cylinder block.
5. Starting at top center, tighten all cylinder head bolts, in sequence (Fig. 6).
CAUTION: When tightening the rocker arm bolts, make sure the piston in that cylinder is NOT at TDC. Contact between the valves and piston could occur.
6. Install push rods and rocker arm assemblies in their original position. Tighten the bolts to 28 Nm (21 ft. lbs.) torque.
7. Install the intake manifold and throttle body assembly.
8. Install exhaust manifolds.
9. If required, adjust spark plugs to specifications. Install the plugs and tighten to 41 Nm (30 ft. lbs.) torque.
10. Install coil wire.
11. Connect heat indicator sending unit wire.
12. Connect the heater hoses and bypass hose.
13. Install distributor cap and wires.
14. Connect the accelerator linkage and if so equipped, the speed control and transmission kick down cables.
15. Install the fuel supply line.
16. Install the generator and drive belt. Tighten generator mounting bolt to 41 Nm (30 ft. lbs.) torque. Tighten the adjusting strap bolt to 23 Nm (200 in. lbs.) torque.
17. Install the intake manifold-to-generator bracket support rod. Tighten the bolts.
18. Place the cylinder head cover gaskets in position and install cylinder head covers.
19. Install closed crankcase ventilation system.
20. Connect the evaporation control system.
21. Install the air cleaner.
22. Fill cooling system.
23. Connect the negative cable to the battery.
24. Start engine check for leaks.