Assembly
ASSEMBLY
Figure 1 Intermediate Shaft Assembly
NOTE: Do not re-use snap rings when servicing the intermediate shaft assembly. Discard snap rings and install new ones provided with available snap ring service kit.
NOTE: When installing 1/2 & 5/R synchronizers, make sure to align oil slots on synchronizer hub face with oil hold in the shaft splined hub journal.
NOTE: Refer to (Figure 1) for intermediate shaft assembly reference.
1. Press intermediate shaft into NEW roller bearing with arbor press (Figure 2).
Figure 2 Intermediate Shaft Bearing Installation
2. Install intermediate shaft roller bearing snap ring (Figure 3).
Figure 3 Intermediate Shaft Roller Bearing Snap Ring
1 - SNAP RING
3. Install 1st gear thrust bearing (Figure 4). Blue markings on bearing should face down towards output gear.
Figure 4 1st Gear Thrust Bearing Removal/Installation
1 - THRUST BEARING
4. Install 1st gear needle bearing to intermediate shaft (Figure 5).
Figure 5 1st Gear Needle Bearing
1 - 1ST GEAR NEEDLE BEARING
5. Install 1st gear to intermediate shaft (Figure 6).
Figure 6 1st Gear Installation
1 - 1ST GEAR
6. Install 1/2 synchro to fixture 8483. Insert 1st gear blocker ring, friction cone, and reactor ring as shown in (Figure 7).
Figure 7 1/2 Synchro on Fixture 8483
7. Install intermediate shaft to synchro assembly on fixture (Figure 8). When installing 1/2 synchronizer, make sure to align oil slots on synchronizer hub face with oil hole in the shaft splined hub journal. Line up friction cone and reactor ring tabs to gear slots. Remove shaft assembly from fixture.
Figure 8 Install 1/2 Synchro to Intermediate Shaft
8. Install NEW 1/2 synchro snap ring (Figure 9).
Figure 9 1/2 Synchro Snap Ring
9. Install 2nd gear blocker ring (Figure 10).
Figure 10 2nd Gear Blocker Ring
1 - 2ND GEAR BLOCKER RING
10. Install 2nd gear friction cone (Figure 11).
Figure 11 2nd Gear Friction Cone
1 - 2ND GEAR FRICTION CONE
11. Install 2nd gear reactor ring (Figure 12).
Figure 12 2nd Gear Reactor Ring
1 - 2ND GEAR REACTOR RING
12. Install 2nd gear and needle bearing to intermediate shaft (Figure 13) (Figure 14).
Figure 13 2nd Gear Removal/Installation
Figure 14 2nd Gear Needle Bearing Removal/Installation
1 - NEEDLE BEARING
13. Press 3/4 cluster gear onto intermediate shaft using cup 8481 (Figure 15).
Figure 15 Install 3/4 Cluster Gear using Tool 8481
14. Install NEW 3/4 cluster gear snap ring (Figure 16).
Figure 16 3/4 Cluster Gear Snap Ring
1 - SNAP RING
15. Install 5th gear and needle bearing to intermediate shaft (Figure 17) (Figure 18).
Figure 17 5th Gear Removal/Installation
Figure 18 5th Gear Needle Bearing Removal/Installation
1 - 5TH GEAR NEEDLE BEARING
16. Install 5th gear blocker ring to synchronizer (Figure 19).
Figure 19 5th Gear Blocker Ring to Synchro
17. Install 5th gear synchronizer assembly to intermediate shaft (Figure 20). When installing 5/R synchronizer, make sure to align oil slots on synchronizer hub face with oil hole in the shaft splined hub journal.
Figure 20 Install 5/R Synchro and 5th Blocker Ring to 5th Gear
18. Install NEW 5/R synchro snap ring (Figure 21).
Figure 21 5/R Synchro Snap Ring
1 - SNAP RING
19. Install reverse gear blocker ring (Figure 22).
Figure 22 Reverse Gear Blocker Ring
20. Install reverse gear needle bearing (Figure 23).
Figure 23 Reverse Gear Needle Bearing
1 - NEEDLE BEARING
21. Install reverse gear to intermediate shaft.
22. Install intermediate shaft sealed roller bearing and thrust washer using installer 8482 (Figure 24).
Figure 24 Sealed Roller Bearing Installation
23. Install NEW intermediate shaft sealed bearing snap ring (Figure 25).
Figure 25 Intermediate Shaft Bearing Snap Ring