Operation CHARM: Car repair manuals for everyone.

2nd Row-Stow -N- Go







INSTALLATION





1. Position the seat back frame and install the retaining bolts (1). Tighten the bolts to 48 Nm (35 ft. lbs.).
2. Install the seat back cover and foamSeat Back Cover/Foam - Installation.