Operation CHARM: Car repair manuals for everyone.

Installation


Engine, 3.OL Turbo Diesel/Manifolds/LINKAGE, Swirl Valve/lnstallation

INSTALLATION







1. Install the round clips (2) into the swirl valve linkage.
2. Tighten the EGR cooler bolts to 12 N.n (106 in. lbs.).
3. Install the intake manifold manifold Intake Manifold
4. Connect the negative battery cable.