Operation CHARM: Car repair manuals for everyone.

Installation






INSTALLATION










1. Position the heat shields (1) to the floor pan or the frame and install the screws and nuts.
2. Tighten the screws/nuts to 7 Nm (60 in. lbs.) torque. Tighten the muffler hangers (2) to 23 Nm (200 in. lbs.)
3. Lower the vehicle.