B1969
B1969-00-POWER LIFTGATE OPEN DIRECTION EXCESSIVE POSITION SENSOR COUNTS
For a complete wiring diagram, refer to the Wiring Information.
- When Monitored:
During Power Liftgate opening cycle.
- Set Condition:
If the Power Liftgate (PLG) Module detects that the Power Liftgate Drive Unit has generated excessive pulses during a full power cycle, this code will set.
1. DTC PRESENT
1. With the scan tool, record and erase DTCs.
2. Turn the ignition off, wait 10 seconds, then turn the ignition on.
3. Operate the Power Liftgate several times from stop to stop if possible.
4. With the scan tool, read the Active DTCs.
Does the scan tool display; B1969-00-POWER LIFTGATE OPEN DIRECTION EXCESSIVE POSITION SENSOR COUNTS?
Yes
- Go To 2
No
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors for an intermittent condition. Operate the liftgate several times and check for any binding conditions.
- Perform the BODY VERIFICATION TEST. Body Verification Test.
2. BINDING LIFTGATE
1. Examine the liftgate for proper alignment, worn or binding hinges, weak liftgate prop assembly, loose/hard weatherstrip, for wear or anything that would cause an obstruction to proper operation.
2. If necessary manually operate the power liftgate on a known good vehicle and notice the effort needed to open and close for comparison.
Were there any mechanical problems found?
Yes
- Power Liftgate Operation for the related symptom(s).
- Perform the BODY VERIFICATION TEST. Body Verification Test.
No
- Go To 3
3. POWER LIFTGATE MODULE - POSITION SENSE OPEN
1. Operate the liftgate from the full closed position and put an obstacle in its path to make it reverse.
Did the liftgate reverse back to the closed position?
Yes
- Go To 4
No
- Check to see if there is an updated flash for this module. If there is not an updated flash available, replace the Power Liftgate Module. Power Liftgate Control Module - Removal.
- Perform the BODY VERIFICATION TEST. Body Verification Test.
4. (Q901) LOGIC GROUND OPEN
1. Turn the ignition off.
2. Disconnect the Power Liftgate Drive Unit harness connector.
3. Disconnect the Power Liftgate Module C2 harness connector.
4. Measure the resistance of both of the (Q901) Logic Ground circuits between the Power Liftgate Drive Unit harness connector and the Power Liftgate Module C2 harness connector.
Is the resistance below 2.0 Ohms for both measurements?
Yes
- Go To 5
No
- Repair the (Q901) Logic Ground circuit for an open.
- Perform the BODY VERIFICATION TEST. Body Verification Test.
5. (Q51) FULL OPEN SWITCH CIRCUIT OPEN
1. Disconnect the Power Liftgate Module C1 harness connector.
2. Measure the resistance of the (Q51) Full Open Switch circuit between the Power Liftgate Drive Unit connector and the Power Liftgate Module C1 connector.
Is the resistance below 2.0 Ohms?
Yes
- Go To 6
No
- Repair the (Q51) Full Open Switch circuit for an open.
- Perform the BODY VERIFICATION TEST. Body Verification Test.
6. (Q51) LIFTGATE FULL OPEN SWITCH SENSE CIRCUIT SHORTED TO GROUND
1. Measure the resistance between Ground and the (Q51) Full Open Switch circuit.
Is the resistance below 10K Ohms?
Yes
- Repair the (Q51) Full Open Switch circuit for a short to ground.
- Perform the BODY VERIFICATION TEST. Body Verification Test.
No
- Replace the Power Liftgate Drive Unit. Power Liftgate Drive Unit - Removal.
- Perform the BODY VERIFICATION TEST. Body Verification Test.