Operation CHARM: Car repair manuals for everyone.

Tightening Specifications

Lower Intake Manifold to Cylinder Head Step 1 -
Hand start and snug nuts at positions 3 and 4.
Step 2 4-8 Newton Meter (Nm)
Step 3 8-15 Newton Meter (Nm)
Step 4 15-21 Newton Meter (Nm)
Step 5 21-25 Newton Meter (Nm)
Repeat after warm up.
Lower Intake Manifold Stud to Cylinder Block 14-16 Newton Meter (Nm)
Fuel Supply Manifold to Lower Intake Manifold 8-11 Newton Meter (Nm)
Upper Intake Plenum Step 1 10 Newton Meter (Nm)
Step 2 21-25 Newton Meter (Nm)
Throttle Body to Upper Intake Plenum 8-11 Newton Meter (Nm)