Operation CHARM: Car repair manuals for everyone.

Attachment II - Labor and Part Information

SAFETY RECALL 92S44

LABOR ALLOWANCES
* 5.8L and 7.3L Engines Only Inspect Both Front Calipers for Phenolic Pistons

0.6 Hrs. - Insert in Box "A" on Form 1864

Install Front Caliper Piston Insulators (Includes Inspect Time Above)

0.9 Hrs. - Insert in Box "B" on Form 1864

Install Brake Tube Insulator Jackets on Vehicles Equipped With 7.5L EFI Engines

* 7.5L Built Before 12/1/89
Inspect For Phenolic Pistons and Install Four Brake Tube Insulators

1.1 Hrs - Insert in Box "B" on Form 1864

Install Piston Insulators and Four Brake Tube Insulators (Includes Inspect Time Above)

1.4 Hrs. - Insert in Box "C" on Form 1864

7.5L Built After 12/1/89
Inspect For Phenolic Pistons and Install Two Brake Tube Insulators

0.9 Hrs. - Insert in Box "B" on Form 1864

Install Piston Insulators and Two Brake Tube Insulators (Includes Inspect Time Above)

1.2 Hrs. - Insert in Box "C" on Form 1864

Administrative Allowance 0.1 Hrs.

NOTE:
Add 0.1 hour Administrative Allowance to the total repair time.

PARTS REQUIREMENTS





Parts will not be direct shipped for this recall. Order your parts requirements through normal order processing channels.

Parts prices current until next issue of Master Price Book. For latest prices, check or call your:

^ Order Processing Center
^ DOES II
^ Updated Price Book