Test B: No Power in ACC
PINPOINT TEST B: NO POWER IN ACCNormal Operation
The battery junction box (BJB) provides the ignition switch with fused battery power through fuse 7 (60A) along circuit 1050 (LG/VT). When placed in ACC, the ignition switch provides fused battery power to the central junction box (CJB) through circuit 297 (BK/LG).
Possible Causes
^ Circuit open
^ Fuses
^ Ignition switch