Test E: The Demand Lamps Are Inoperative
PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVEE1-E3:
Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN09 (YE/GN). The demand lamps are grounded through circuit GD150 (BK/WH).
Possible Causes
- Fuse
- Circuit CLN09 (YE/GN) open or short to ground
- Circuit GD150 (BK/WH) open
- SJB