Test V: The Panel/Floor and Cool/Warm Controls Are Inoperative - Using the Front Auxiliary Climate Controls
PINPOINT TEST V: THE PANEL/FLOOR AND COOL/WARM CONTROLS ARE INOPERATIVE USING THE FRONT AUXILIARY CLIMATE CONTROLSV1-V2:
Normal Operation
Under normal operation, the front auxiliary climate control assembly receives voltage from circuit C_CBP18 (GY/OG) and ground from GD149 (BK/GY).
Possible Causes
- Fuse
- An open in circuit C CBP18 (GY/OG) or GD149 (BK/GY)
- Front auxiliary climate control assembly