Operation CHARM: Car repair manuals for everyone.

Connecting Rod, Engine













a Time required for the plunger to leak down 1.6 mm of travel with 222 N force and leak-down fluid in the lash adjuster.
b Full indicator measurement on all journals when supported on front and rear journals (4 places).

ROD BEARING CAP




Tighten the 16 connecting rod bearing cap bolts in 2 stages, using the sequence shown.
Stage 1: Tighten to 43 Nm (32 lb-ft).
Stage 2: Tighten an additional 105 degrees.