Operation CHARM: Car repair manuals for everyone.

Cylinder Head Assembly: Service and Repair




NOTE: Ford does not provide camshaft gear timing marks, or information to perform timing belt service without the special tools shown in this procedure.

REMOVAL
1. Drain engine coolant from radiator and cylinder block by removing the drain plugs.
2. Remove the intake manifold.
3. Remove exhaust manifold.
4. Remove camshafts.
5. Remove valve tappets from cylinder head, then support front of engine with wood block between crankshaft pulley and front subframe.
6. Remove righthand engine lifting eye bolt, then righthand engine lifting eye.
7. Remove power steering pump mounting bracket and cylinder head support bracket.
8. Remove camshaft timing belt tensioner pulley and front cover from front of cylinder head.
9. Remove water thermostat housing from cylinder head as follows:
a. Raise and support vehicle.
b. Disconnect crankcase ventilation tube from positive crankcase ventilation valve.
c. Disconnect upper radiator hose and radiator overflow hose from water hose connection.
d. Remove water outlet connection bolts and water hose connection from water thermostat housing.
e. Remove water thermostat and seal from water thermostat, then seal from water thermostat housing. Inspect seals for damage and replace if necessary.
10. Remove ignition coil bracket from cylinder head as follows:
a. Disconnect fuel charging wiring or engine control sensor wiring from ignition coil, then ignition wires by squeezing locking tabs and twisting while pulling upward.
b. Remove ignition coil bolts or screws, then coil.
c. Remove ignition coil bracket.

Fig. 11 Cylinder head bolt removal sequence:





11. Remove spark plugs from cylinder head, then cylinder head bolts in sequence. Discard cylinder head bolts.
12. Remove cylinder head and head gasket from cylinder block.
13. If necessary, remove lefthand engine lifting eye from cylinder head.
14. Inspect cylinder head and cylinder block, then replace components as required.

INSTALLATION
1. Reverse procedure to install, noting following:
a. Clean cylinder head intake manifold, valve cover and cylinder head gasket surfaces. Ensure flatness of cylinder head and cylinder block gasket surfaces meets specifications.

Fig. 12 Cylinder head bolt tightening sequence:





b. Torque new cylinder head bolts in sequence, first to 15-22 ft lb, then to 30-37 ft lb. Finally tighten all bolts an additional 90-120° in the same sequence.