Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.30.0AAdd The Following Operations If Performed Along With "Piston & Ring" Jobs.
Crankshaft, Renew3.90.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.70.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Timing Chain, Renew1.30.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0ASee Valves Grind Head Removed & Combinations
One CYL
Right Bank9.36.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.46.4AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.29.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.40.2Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
With A.I.R., Add0.70.4Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank10.37.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.47.4AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.111.1AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.40.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
With A.I.R., Add0.70.4AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.