Operation CHARM: Car repair manuals for everyone.

Manual Transmission/Transaxle: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
4 Speed, Hydromatic M20
R&R Only
Note
With Skid Plate, Add0.50.3B
To Overhaul Shifter Cover, Add1.10.8B
To Replace Main Drive Gear
Bearing Retainer and/or Gasket, Add0.40.2B
To Replace Main Drive Gear Bearing, Add1.81.3B
To Overhaul Main Shaft, Add2.21.6B
To Replace Case, Add2.11.5B
Renew Unit
Note
With Skid Plate, Add0.50.3B
4 Speed
R&R Only2.60.0B
Note
With Skid Plate, Add0.20.1B
To Overhaul Shifter Cover, Add0.50.3B
To Replace Main Drive Gear Bearing, Add0.40.2B
To Overhaul Main Shaft, Add2.11.5B
To Replace Case Extension and Seal, Add0.90.6B
To Replace Speedometer Drive Gear, Add1.00.7B
To Replace Case, Add1.30.9B
Renew Unit3.00.0B
Note
With Skid Plate, Add0.20.1B
Overhaul/Rebuild
4 Speed, Hydromatic M20
Note
With Skid Plate, Add0.50.3A
4 Speed, New Process5.60.0A
Note
With Skid Plate, Add0.20.1A