Operation CHARM: Car repair manuals for everyone.

Linear Shift Assembly - Disassemble

LINEAR SHIFT ASM (DISASSEMBLY)
BALL & ACTUATOR ASM
SHIFT LEVER CLEVIS
PARK LOCK CABLE ASM
G/S LEVER ASM SUPPORT BRKT (column shift only)







^ Tools Required:
- J 41352 Modular Column Holding Fixture
- J 41396 Park Lock Cable Pliers
- Or Equivalents

DISASSEMBLE
1. Do all installation steps Remove or disconnect , lower and upper shrouds.
2. Hexagon flanged head bolt (46).
3. Ball & actuator assembly (45).








4. Pry off locking ring on park lock cable assembly (48).
- Move park lock latch to gain access to lower oval head 6-lobed socket tap screw (47).
5. Two oval head 6-lobed socket tap screws (47) from shift gate.
6. Shift lever clevis (41).
a. Lift up on shift gate and rotate shift lever clevis (41).
b. Clevis (41) from gearshift lever assembly support bracket (49).
7. Park lock cable assembly (48) from support bracket (49). Insert retaining clip.
8. Pry actuator arm of electrical Brake Transmission Shift Interlock (BTSI) actuator (61) from outer shift cable ball stud on cable shift cam assembly (44).
9. Pry transaxle shift cable from inner ball stud on cable shift cam assembly (44).
10. Hexagon flange head bolt (46).
11. Cable shift cam assembly (44).
12. Cam bushing (63) from cable shift cam assembly (44).
13. Three flat head 6-lobed socket tap screws (43).
14. Gearshift lever assembly support bracket (49).

ASSEMBLE
1. Lubricate all moving parts of assembly with synthetic grease.
2. Gearshift lever assembly support bracket (49).
3. Three flat head 6-lobed socket tap screws (43). Tighten (43) to 10 Nm (89 lb in).
4. Insert cam bushing (63) into cable shift cam assembly (44).
5. Cable shift cam assembly (44).
6. Hexagon flange head bolt (46). Tighten (46) to 18.0 Nm (14 lb ft).
7. Transaxle shift cable to inner ball stud on cable shift cam assembly (44).
8. Actuator arm of electrical BTSI actuator (61) to outer shift cable ball stud on cable shift cam assembly (44).
9. Park lock cable assembly (48) to support bracket (49).
10. Shift lever clevis (41) and shift gate to support bracket (49).
a. Position shift gate to end of clevis (41) lever.
b. Rotate clevis (41) and shift gate into position.
c. Push against shift lever spring tension to align shift gate holes with support bracket (493 holes.
11. Two oval head 6-lobed socket tap screws (47). Tighten (47) to 6.5 Nm (58 lb in).
12. Ball & actuator assembly (45).
13. Hexagon flanged head bolt (46). Tighten (46) to 18.0 Nm (14 lb ft).
14. Park lock cable assembly (48) to lock module assembly (15).
- Lock cylinder should be in "OFF-LOCK" position and gear shift in "PARK" position.
- Locking tab on end of cable (48) to slot in module assembly (15).
15. Do Adjust and Inspect, Refer to Linear Shift Assembly Replacement.
16. Do all installation steps, Refer to Shroud and Lock Cylinder Set Replacement.