S207
In the IP harness, approximately 6 cm (2 in) from the park brake warning switch breakout, toward the datalink connector (DLC) breakoutIn the IP harness, approximately 5 cm (2 in) into the VSS buffer breakout
In the IP harness, approximately 4 cm (1.6 in) into the VSSB breakout