| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
One Cylinder |
Manual Trans |
Right Bank | 12.5 | 9.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 12.5 | 8.9 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 14.8 | 10.4 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Auto Trans |
Right Bank | 15.8 | 11.2 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 15.8 | 11.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 17.2 | 12.6 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
All Cylinders |
Manual Trans |
Right Bank | 13.0 | 9.9 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 13.0 | 10.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 16.3 | 11.9 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Auto Trans |
Right Bank | 16.8 | 12.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 16.8 | 12.3 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 19.3 | 14.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
NOTE |
With AC, Add | 0.3 | 0.2 | A | |
With A.I.R., Add |
Right Bank | 0.4 | 0.3 | A | |
Left Bank | 0.3 | 0.2 | A | |
Both Banks | 0.6 | 0.5 | A | |
With Oil Cooler, Add | 0.1 | 0.1 | A | |
With Three Piece Engine Cover, Add | 0.2 | 0.1 | A | |
To Grind Valves, Add | 3.0 | 2.5 | A | |
To R&R Piston, Pin or Connecting Rod, Add |
One | 0.2 | 0.0 | A | |
Each Additional | 0.1 | 0.0 | A | |
All | 0.8 | 0.0 | A | |
To R&R Connecting Rod Bearings, Add |
Each | 0.1 | 0.0 | A | |