Energy Storage Box (ESB) 120V Cable Replacement
ENERGY STORAGE BOX (ESB) 120V CABLE REPLACEMENT
REMOVAL PROCEDURE
1. Disconnect the 120-volt AC electrical connector (3).
2. Remove the energy storage box (ESB) intermediate cover.
3. Remove the receptacle outlet cover screws (1).
4. Remove the 120-volt cable connector screws.
5. Disconnect the retainers securing the 120-volt cable to the ESB.
6. Note the routing of the 120-volt cable.
7. Remove the 120-volt cable (1) out through the receptacle opening (2) in the ESB.
INSTALLATION PROCEDURE
1. Feed the 120-volt cable (1) through the receptacle opening (2) in the ESB.
2. Route the 120-volt cable as noted earlier.
3. Connect the retainers securing the 120-volt cable within the ESB.
NOTE: Refer to Fastener Notice in Service Precautions.
4. Install the 120-volt cable connector screws.
Tighten the screws to 6 N.m (53 lb in).
5. Install the receptacle outlet cover screws (1).
Tighten the screws to 0.5 N.m (4.4 lb in).
6. Install the ESB intermediate cover.
7. Connect the 120-volt AC electrical connector (3).