Energy Storage Box (ESB) Intermediate Cover Replacement
ENERGY STORAGE BOX (ESB) INTERMEDIATE COVER REPLACEMENT
REMOVAL PROCEDURE
1. Remove the energy storage box (ESB) trim cover.
2. Disconnect the ESB.
3. Remove the ESB intermediate cover screws.
4. Remove the ESB intermediate cover.
INSTALLATION PROCEDURE
1. Install the ESB intermediate cover.
IMPORTANT: Ensure that the ESB intermediate cover is installed between the ESB metal carrier and the 120V receptacle faceplate.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the ESB intermediate cover screws.
Tighten the screws to 6 N.m (53 lb in).
3. Connect the ESB.
4. Install the ESB trim cover.