Operation CHARM: Car repair manuals for everyone.

Shift Solenoid Valve Assemble



Shift Solenoid Valve Assemble

Tools Required
* J 33163 Valve Tray Set
* J 43773 Valve Spring Compressor





Important: To help prevent confusing parts on assembly, J 33163 has been used during the disassemble procedure in order to store the removed valves, springs, and stops.

1. Install the shift solenoid screen (1).
2. Measure the screen installation depth at dimension A.

The screen installed depth is 0.50-1.0 mm (0.020-0.039 in) below the shift valve body surface as shown.




3. Install the control main valve (1) and the control main spring (2).




4. Compress the spring with J 43773 (2).
5. Install the retaining clip (1).
6. Make sure the retaining clip is below the valve body surface.




7. Install shift valve 2 (SV2) (1), spring (2), and plug (3).




8. Compress the spring with J 43773 (2).
Install the retaining clip (1).
9. Make sure the retaining clip is below the valve body surface.




10. Install shift valve 3 (SV3) (1), the spring (2), and plug (3).




11. Compress the spring with J 43773 (2).
12. Install the retaining clip (1).
13. Make sure the retaining clip is below the valve body surface.




14. Install shift valve 1 (SV1) (1) and spring (2).




15. Compress the spring with J 43773 (2).
16. Install the retaining clip (1).
17. Make sure the retaining clip is below the valve body surface.