Operation CHARM: Car repair manuals for everyone.

Installation

Engine Coolant Temperature (ECT) Sensor

Installation

1. Apply Loctite 262 or equivalent to the threads of the ECT sensor, and tighten it to the specified torque.

Tightening torque: 25 N.m (18 lb.ft)







2. Connect the harness connector to the ECT sensor.
3. Replenish the cooling water.
- Refer to 'Reference (cooling water replenishment procedure)' part of 'Cooling System'.