System Test - Antenna
Antenna System Test:
Antenna System Test:
Lead-In-cable Resistance Values:
Antenna System Resistance Values:
NOTE: Before measuring the resistance of the Antenna, remove the negative (-) battery cable and "zero" the meter before taking measurements. When checking resistance, cautiously wiggle the lead-in tip and cable. the readings below should always be obtained. If not, some portion of the lead-in is intermittent and the lead-in should be replaced.