Operation CHARM: Car repair manuals for everyone.

Solenoid Valve Test

Solenoid Valve Test





1. Disconnect the solenoid harness connector (8P).
2. Measure CVT drive pulley pressure control valve assembly resistance between solenoid harness connector terminals No. 3 and No. 7.
STANDARD: 3.8 - 6.8 Ohms
3. Measure CVT driven pulley pressure control valve assembly resistance between terminals No. 2 and No. 6.
STANDARD: 3.8 - 6.8 Ohms
4. Measure CVT start clutch pressure control valve assembly resistance between terminals No. 4 and No. 8.
STANDARD: 3.8 - 6.8 Ohms
5. Measure the inhibitor solenoid resistance between terminal No. 5 and body ground.
STANDARD: 11.7 - 21.0 Ohms
6. Replace the lower valve body assembly, if the measurement of any solenoid is out of standard.
7. If all of the resistances are within the standard, a clicking sound should be heard when connecting the battery terminals to the solenoid harness connector terminals.
^ CVT drive pulley pressure control valve assembly
No. 3 to battery positive terminal
No. 7 to battery negative terminal
^ CVT driven pulley pressure control valve assembly
No. 2 to battery positive terminal
No. 6 to battery negative terminal
^ CVT start clutch pressure control valve assembly
No. 4 to battery positive terminal
No. 8 to battery negative terminal
^ Inhibitor solenoid
No.5 to battery positive terminal and body ground to negative terminal
8. If no clicking sound is heard, remove the lower valve body assembly, and check the solenoid.