Operation CHARM: Car repair manuals for everyone.

System Inspection





Charging System Inspection

1. Engine "ON"
2. headlight and rear defroster "ON".
3. Measure voltage between terminal (+) and (-) of battery maintaining ENG. RPM at 2,500 RPM (idle) over 2 minutes.

Specification : more than 10V





4. Is the measured voltage within specifications ?