Operation CHARM: Car repair manuals for everyone.

Component Inspection





Component Inspection

1. CMPS, CKPS Inspection
(1) IG "OFF" and connect scantool.
(2) ENG "ON" and Measure signal waveform at terminal 3 of CMPS.
(3) Measure signal waveform at terminal 1 or 2 of CKPS.

Specification : 17th signal of the CKPS after missing tooth is aligned with the high signal of the CMPS at idle, PCM recognizes that Synchronization between CKPS and CMPS is completed.





(4) Is the measured signal waveform O.K ?





2. Timing Mark Inspection.
(1) IG "OFF" and check the timing mark is correctly aligned.




(2) Is the timing mark correctly aligned ?