Operation CHARM: Car repair manuals for everyone.

Heated Glass Element Relay: Testing and Inspection





Inspection

Check for continuity between the terminals.
1. There should be continuity between the No.30 and No.87 terminals when power and ground are connected to the No.85 and No.86 terminals.
2. There should be no continuity between the No.30 and No.87 terminals when power is disconnected.