Operation CHARM: Car repair manuals for everyone.

Heated Glass Element Switch: Testing and Inspection

1. Disconnect the defogger switch connector from the wiring harness.








2. Operate the switch, and check the continuity between the terminals.
3. If continuity is not as specified, replace with new one.





1. Time specification
- T1 : Min. 0.1 sec.
- T2 : 15 ± 3 min.