Operation CHARM: Car repair manuals for everyone.

Valve Guide Seal: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank21.615.6BIncludes: R&I Cylinder Head.
Left Bank22.216.0BIncludes: R&I Cylinder Head.
Both Banks24.918.4BIncludes: R&I Cylinder Head.
NOTE
With AC, Add1.21.0B