Operation CHARM: Car repair manuals for everyone.

W/Harness Inspection





Automatic Transaxle

U0001 High Speed CAN Communication Bus off - W/Harness Inspection

Terminal and Connector Inspection

1. Many malfunctions in the electrical system are caused by poor harness and terminals. Faults can also be caused by interference from other electrical systems, and mechanical or chemical damage.
2. Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.
3. Has a problem been found?






Signal Circuit Inspection

System check
1. Ignition "OFF" & Engine "OFF".
2. Measure Resistence between "CAN HIGH" terminal and "CAN LOW" terminal of "Data link connector"

Specification : Approx. 60 ± 10 Ohms




3. Is measured resistance within specifications?





Cluster check
1. Ignition "OFF" & Engine "OFF".
2. Disconnect "ECM & TCM" connector.
3. Measure Resistence between "CAN HIGH" terminal and "CAN LOW" terminal of ECM wiring side.

Specification : Approx. 120 ± 10 Ohms




4. Is measured resistance within specifications?





ECM Check
1. Ignition "OFF" & Engine "OFF".
2. Disconnect "Cluster & TCM" connector.
3. Measure Resistence between "CAN HIGH" terminal and "CAN LOW" terminal of Cluster wiring side.

Specification : Approx. 120 ± 10 Ohms




4. Is measured resistance within specifications?






How to perform Initial Learning

If you replace the automatic transmission or TCU, or if you overwrite the TCU software, be sure to initialize the learned values and perform initial learning.

Step 1) Warm-up
Raise the ATF temperature by leaving the vehicle idling or performing city drive. Check the ATF temperature using the Scan-tool and make sure it is between 50 °C (122 °F) and 120 °C (248 °F). If the ATF temperature is outside this range, work to bring the range.

CAUTION:
Don't raise the oil temperature by stalling the engine.

(Reference)
If the oil temperature is not between 50 °C (122 °F) and 120 °C (248 °F), initial learning can not be performed. Before learning, check for variable speed shock or shift shock.

STEP 2) Garage shift learning ("N->R", "N->D")
With the vehicle standing still, depress the brake and keep the shift lever in "N" for 3 seconds. Then, shift from "N" into "D", and maintain this condition for 3 seconds.
Repeat this procedure 5 times. Then repeat it 5 times in the same way for "R".

STEP 3) Garage shift control learning
In "D", with the throttle opening between 25 and 35%, drive until you reach 6th gear and a vehicle speed at 80 km/h or higher. Then, release the accelerator pedal and coast, and bring the vehicle to a stop in 60 seconds minimum. Repeat this procedure 10 times.

STEP 4) Check learning results
Check that variable speed shock and shift shock have decreased compared to conditions before learning.

How to perform "N" position learning

If you replace the automatic transmission or TCU, be sure to perform 'N" position learning.

Step 1) Shift to P range so that vehicle is in standstill. Turn IG ON but Engine is OFF.
Step 2) After releasing shift lock, shift the shift lever to "N" position.
Step 3) Install the SST on the shaft of inhibitor switch, and then, assemble the SST with aligning neutral line on the SST with neutral line on the inhibitor switch.
Step 4) Tighten the bolt after confirm the Neutral lines are aligned with.