Operation CHARM: Car repair manuals for everyone.

Component Inspection





Engine Control
P0447 Evaporative Emission System-Vent Control Circuit Open - Inspection/Repair:_:Component Inspection

Component Inspection

Check CCV
1. IG "OFF" and disconnect CCV connector.
2. Measure resistance between power and control terminals of CCV connector.(Component side)

Specification :Approx. 15.5 - 18.5Ohms (20°C(68°F))




3. Is the measured siganl waveform normal?