Shift Rod Components
Shift Rod Assembly1. Install fork guide, shift fork spring, 2-4 fork, and L-H fork to shift rod, and secure them with roll pins.
- Do not reuse roll pins.
2. Install 2-4 sleeve and L-H sleeve to each fork.
3. While aligning L-H sleeve with planetary carrier, install shift rod assembly to front case.
4. Remove all the liquid gasket on check plug and front case, and install check ball and check spring to front case. Apply gasket fluid 1215 (Three Bond) to check plug, install it to front case, and tighten it to specified torque.
- With plug bolt threaded one pitch into the hole, apply gasket fluid 1215 (Three Bond) to the thread.
19 - 25 Nm (1.9 - 2.5 kg-m, 14 - 18 ft. lbs.)
5. Remove all the liquid gasket on the switch fitting and inner side of front case, and with wait detection switch threaded one pitch into the hole, apply gasket fluid 1215 (Three Bond) to the thread, install it, and tighten it to specified torque.
15 - 20 Nm (1.5 - 2.0 kg-m, 11 - 14 ft. lbs.)
- Wait detection switch harness connector is black.
6. Install center case assembly to front case assembly.
7. Install rear case assembly to center case.